PERI Australia Pty. Ltd., Projects

PERI Systems In Use

TRIO

Roof formwork.

Epping to Chatswood Tunnel

This section of the rail tunnel passed through a national park and was originally proposed as a bridge. Due to community concerns they decided to tunnel below the national park. Cut and cover was the proposed method as the tunnel roof was just ...
Spillway.

Jyndabyne Dam

Jindabyne Dam, one of a series of dams that forms part of Australia's famous Snowy Mountains Hydro Electric Scheme had a new 3.6 metre diameter tunnel, training walls, spillway walls and new intake tower added in 2005. The projects is part ...
The SKYDECK aluminium panel slab formwork system is being used to construct the slabs for the 8-storey building.

BGC Offices

The project involved the construction of a 8-level office tower with 4 levels of carpark on the lower floors and 4 levels of office space on the upper floors. The total slab area was 13,000 m2.
The TRIO wall formwork system being used to construct the bridge abutment.

Geelong Bypass

Section one of the Geelong Bypass project involved a new bypass from Corio to the Midland Highway. The rail overpass consisted of two abutments each measuring 36 metres long by 9.8 metres high.

Lawrence Hargrave Drive Bridge

Scenic bridge constructed partially over the ocean using PERI know-how