PERI Systems In Use

TRIO

Spillway.

Jindabyne Dam

Jindabyne Dam, one of a series of dams that forms part of Australia's famous Snowy Mountains Hydro Electric Scheme had a new 3.6 metre diameter tunnel, training walls, spillway walls and new intake tower added in 2005. The projects is part ...
The SKYDECK aluminium panel slab formwork system is being used to construct the slabs for the 8-storey building.

John Holland offices

The project involved the construction of a 8-level office tower with 4 levels of carpark on the lower floors and 4 levels of office space on the upper floors. The total slab area was 13,000 m2.
The TRIO wall formwork system being used to construct the bridge abutment.

Geelong Bypass

Section one of the Geelong Bypass project involved a new bypass from Corio to the Midland Highway. The rail overpass consisted of two abutments each measuring 36 metres long by 9.8 metres high.
Blue C Resort Coolangatta

Blue C Resort Coolangatta

Blue C Resort built for the Grand Mecure chain by Formwell Construction. The Blue C project, overlooking Coolangatta Beach at the bottom of the Gold Coast, was built using the full building envelope which limited room to strip or stack formwork.
PERI TRIO & CB240 plus special formwork for acrched soffit.

Dendrobium Coal Mine

This chamber in the coal mine located about 1 hours drive south of Sydney, was constructed fast and efficiently using a range of PERI formwork and scaffolding.